PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Forming wall forms along C.7 line from  4 to 6.5 line Facing South-West -1  (800x600).jpg Hoisting material for Elev. 1,2,3 Facing South (800x600).jpg Assembling slip forms at Elev. 1,2,3 Facing South-East (800x600).jpg Building Rebar mats for Elev. 1,2,3 (800x600).jpg Forming wall forms along C.7 line from  4 to 6.5 line Facing South-West  -2.jpg Rebar inside wall forms along C.7 Facing South (800x600).jpg Wall form Rebar along C.7 Facing South (800x600).jpg
Previous pageNext page Assembling slip forms at Elev. 1,2,3 Facing South-East (800x600)
Assembling slip forms at Elev. 1,2,3 Facing South-East (800x600)